construction cost

英 [kənˈstrʌkʃn kɒst] 美 [kənˈstrʌkʃn kɔːst]

工程费;建筑费

化学



双语例句

  1. Determining depreciation is based on the construction cost, value, the liquidation costs and depreciable lives.
    确定折旧费的依据是建筑造价、残值、清理费用和折旧年限。
  2. It is usually seems to be a contradiction to green architecture and construction cost.
    发展绿色建筑与节约建设成本通常被人们认为是一对矛盾。
  3. This paper analyzes the reasons why the default on construction cost occurs in railway electrification construction enterprise, and advances some countermeasures.
    分析了铁路电气化施工企业形成工程款拖欠的原因,并提出了相应的对策。
  4. The construction project construction cost management's core lies in reasonable definite and the active control building cost of projects, the goal lies in raises the project benefit.
    建设工程造价管理的核心在于合理确定和有效控制工程造价,目标在于提高工程效益。
  5. Management Reformation and Practice of Continuing Education of Construction Cost Engineer
    造价工程师继续教育管理改革和实践
  6. Completes the project construction cost to Jiahe the control work, to guaranteed has the count for much significance with the acceleration economy development.
    做好工程造价的控制工作,对保证和加速经济发展具有非常重要的意义。
  7. The control of construction cost is elaborated, and the content of controlling limitation design in analyzed in the paper.
    阐述了设计阶段工程造价的控制,并分析了限额设计的控制内容。
  8. In the HG Hotel Project Construction Cost Risk Management Research
    在HG酒店项目建设中成本风险管理研究
  9. Application of Earned Value Analysis in Construction Cost Control of Infrastructure Projects in Colleges
    挣值分析法在高校基建项目建设成本控制中的应用
  10. Risk management and control of material expense of construction cost
    工程造价中材料费用的风险管理与控制
  11. Part one: development environment and status research of construction cost consultation industry of our country.
    第一部分:我国工程造价咨询业发展环境及现状研究。
  12. Effective control on construction cost is essential for increasing profit and sustainable development of a construction company.
    对成本的有效控制是施工企业增加盈利、实现企业持续发展的基础。
  13. The tentative amount is an important component of the construction cost.
    暂列金额是工程造价的重要组成部分。
  14. Based on the theory of scientific management, this paper studies both the organization way and the organization structure of construction cost examination.
    文中应用科学管理理论的原理对造价审查的组织方式、组织结构进行了探讨。
  15. Discusses the design of coil spaces, and compares the floor panel heating system with the general radiant heating system in construction cost.
    讨论了地板辐射供暖盘管间距的大小,并将地板辐射供暖系统与常规的散热器供暖系统在工程造价上进行了对比。
  16. Analysis on the impact of highway construction cost on project under corporation responsible system
    浅析项目法人制对公路工程造价的影响
  17. So the construction cost is greatly reduced, and the construction efficiency is improved.
    从而使施工费用大大降低,提高了施工效率。
  18. Improving the product quality of design and controlling the construction cost
    提高设计产品质量控制工程造价
  19. The proposed method provides a scientific and reliable means for the risk assessment of shield tunnel construction cost.
    该方法为盾构隧道施工成本的风险评估提供了一种科学和可靠的手段。
  20. Information Influence and Analysis of Water Conservancy Engineering Construction Cost Management
    水利工程造价管理的信息影响与分析
  21. Using the construction method of plain brings about the maladjustment of machine deploying and elevation of construction cost.
    如果在高原地区施工仍然采用平原地区的机群配置,必然导致整个施工机群配置的失调,施工成本的提高。
  22. The budget and balance auditing of construction cost is necessary procedure of ensuring construction cost reasonably.
    摘要工程造价的预结算审核是合理确定工程造价的必要程序及重要手段。
  23. In this paper the control of construction cost during engineering design was described and discussed.
    对工程项目设计阶段的造价控制进行了分析与论述。
  24. It can simplify the construction structure, reduce the construction cost by not use top floor machine room.
    由于无顶层机房,可使建筑结构设计简化,降低建筑成本。
  25. The construction cost management is the entire project management important component, it involves to the project participation side benefit, must complete the building cost of projects work.
    造价管理是整个工程管理的重要组成部分,它涉及到工程参与方的利益,因此必须做好工程造价的工作。本文将对建筑工程造价控制进行分析。
  26. Discussion on Full Process Management of Construction Cost in Project Agent-construction System
    项目代建制中的全过程造价管理探讨
  27. Construction cost management of construction enterprise after implement of engineering quantity list pricing;
    工程量清单计价方法是国际上较为通用的一种先进的造价管理方法。
  28. Analysis of Approaches to Improve the Quality of Construction Cost Examination
    提高建筑工程造价预结算审查质量的方法与途径分析探讨
  29. Users to reduce their cochlear room construction cost of the trouble and the crew are free to move.
    用户使用时,减少自己建造蜗室的麻烦和成本,机组可随意移动。
  30. This paper analyzes the problems faced by the current engineering cost audit, and probes into the measures for avoiding the risk of construction cost audit.
    分析了当前工程造价审核面临的问题,探讨了规避工程造价审核风险的措施。